Professional native human translation provider
Get a Free Quote now!

Tel:0086-18206071482

Request a Free Quote
To provide you with quality service, adhere to the principle of customer first.
  • You may attach one or more files up to 10MB per file in this form.

Bullet train arrived at China-Laos Railway Vientiane Station

Oct 17, 2021

Bullet train arrived at China-Laos Railway Vientiane Station

By Target Language Translation Services | Updated: 2021-10-17 16:00

bullet train for China-Laos railway


The streamlined "China-standard" bullet train, or electric multiple unit (EMU) train, for the China-Laos railway arrived at the newly built China-Laos Railway Vientiane Station on Saturday, Oct 17.

The EMU train was officially delivered to the Laos-China Railway Co., Ltd., a joint venture based in the Lao capital Vientiane in charge of the railway's construction and operation, at a handover ceremony held in the station with the attendance of Chinese Ambassador to Laos Jiang Zaidong and Lao Minister of Public Works and Transport Viengsavath Siphandone.

The EMU, named Lane Xang, is to be put into the upcoming railway trial run. Laos was once called the Lane Xang (million elephants) Kingdom. Lane Xang, also known as Lancang, the name of the upper section of the Mekong River in China, symbolizes the China-Laos relationship as good neighbors, good friends, good comrades and good partners.

Ambassador Jiang said in his speech at the Saturday ceremony that Laos receives the first modern train in her history today is decisive progress in the construction of the China-Laos railway, and it is also a landmark achievement of the strategic docking between the China-proposed Belt and Road Initiative and Laos strategy to convert itself from a landlocked country to a land-linked hub.

"According to the current progress of construction, the Lao side proposed the coming Lao National Day (Dec. 2) as the target node to achieve official opening, and we are encouraged and willing to work with the Lao side to realize it," the Chinese ambassador said.

Jiang said that after the opening of the China-Laos Railway, the journey time from Vientiane to the China-Laos border will be shortened from two days to three hours, and that to Kunming can be just overnight, which means a leapfrog development in the connectivity between China and Laos.

The China State Railway Group directed the design and manufacture companies to actively adapt to cross-border transport situations, fully satisfy the needs of the user, and make necessary improvements.

With advanced technology, the Lane Xang EMU is safe, comfortable and reliable with large passenger capacity but low operating costs, and fully meets the main performance indicators required by the China-Laos railway operation.

The Lane Xang EMU is painted in the Lao flag colors of red, blue, and white. The interior design integrates elements of traditional Chinese and Lao cultures, embodying the Lao people's vision of a better life and the friendship between the two peoples.

According to the China State Railway Group, the Lane Xang train, with the maximum operating speed of 160 km per hour, consists of nine carriages, including a locomotive, a dining coach, a first-class and six second-class coaches, and offers altogether 720 seats.

The air-conditioned carriages are spacious with comfortable seats installed with power outlets of Chinese and Lao standards. The dining coach is well equipped to satisfy the needs of passengers for food and leisure; the screens, broadcasts and service signs are all in three languages of Chinese, Lao, and English; and the fourth carriage with barrier-free areas is equipped with special seats, handrails, toilets, SOS call buttons and Braille guide signs to facilitate the travel of disabled passengers.

The China-Laos Railway is a docking project between the China-proposed Belt and Road Initiative and Laos' strategy to convert itself from a landlocked country to a land-linked hub.

The electrified passenger and cargo railway is built with the full application of Chinese management and technical standards. The construction of the project started in December 2016 and is scheduled to be completed and operational in December 2021.



This article is reprinted from China Daily.

If there is a copyright, please inform us in time, we will delete it right the first time.

Sign Up For Newsletter

Please read on, stay posted, subscribe, and we welcome you to tell us what you think.

click here to leave a message

Leave A Message
If you need translation and want to know quotation and delivery time,pls leave a message here,we will reply asap!Thank you!

Home

Services

about

contact